Filling the mould with concrete mixture comes with the corresponding levels vibrators starting, from the lower chord to upper. Leaving about 100 mm gap between the concrete mixture and the upper edge, the upper ring for the pipe edge moulding is mounted.
After filling of the mould with concrete mixture, the vibrators are dismounted and the mould is moving into the steam chamber.