Mould for elliptical cross-sections non-pressure concrete pipes

Concrete   non-pressure   pipes   with   elliptical   cross-sections   (TPFe   pipes)   are   concrete   products   with

diameters ranging from 2 to 3.5 m and a length of up to 2.5 m. They are used for laying of sewerage

systems, drainage systems, and other underground facilities, and they ensure the free flow of domestic

waste water, storm water, and other liquid waste.

A TPFe pipe is made from heavy concrete. It has a smooth surface and is strengthened with rebar. Due to

its high-strength structure, this pipe can bear huge loads caused by soil pressure, vibrations from surface

transport, and aggressive environment.

Supporting foot at the base of a TPFe pipe makes it exceptionally stable. Before laying the pipes down, it

is necessary to prepare a flat sub-ground base. The depth of the pipe laying and the production of TPFe

pipes are regulated by relevant GOST standards. Concrete non-pressure pipes are produced by means of

vibratory pouring.

The M-Konstruktor plant manufactures steel moulds for concrete non-pressure pipes with elliptical

cross-sections.

Pipe steel moulds elements

Our steel moulds for TPFe pipes consist of the following elements:

- a stationary bed used for the positioning of a pallet and an inner shell with respect to one another;

- a pallet, which is a bottom moulding element centering the outer shell;

- an outer shell equipped with locks and guiding rails for concrete pipes’ size restriction, a steam tank for heating, and a condensate collection tank

- an inner shell equipped with a movable cam and a hydraulic drive;

- a moulding ring used for the formation of the upper edge of a concrete product;

- a hood preventing the leakage of the concrete mixture into the inner shell and helping direct the

concrete;

- hydraulic cylinders enabling the cam to move inside the inner shell:

- flow dividers providing simultaneous work of hydraulic cylinders.

You can also purchase a steam jacket to speed up concrete consolidation process. If you have a steam

jacket, heating and consolidation of concrete are carried out on the bed. Thus, you do not have to move

the mould into a steam chamber.

If you use our moulds properly and ensure maintenance is provided in a timely manner, they will endure

over 1000 pouring cycles.

You can order steel moulds for concrete non-pressure pipes with diameters ranging from 600 to 3000 mm

(with a step of 200 mm) and a length of up to 2.5 m.

We also manufacture connection heads for cylindrical pipe joints and moulds for conical and rectangular

joints.

Установка для производства железобетонных труб микротоннелирования ∅ 2420 мм.
Установка для производства железобетонных труб микротоннелирования ∅ 2420 мм.
Установка для производства железобетонных труб микротоннелирования ∅ 2420 мм.
Установка для производства железобетонных труб микротоннелирования ∅ 2420 мм.
Установка для производства железобетонных труб микротоннелирования ∅ 2420 мм.
Установка для производства железобетонных труб микротоннелирования ∅ 2420 мм.


Cost of production and delivery

If you want to get information concerning the production cost of the moulds and its production time, please to contact our specialists by phone: +7 (81153) 6-10-05 or e-mail: info@m-konstruktor.ru.

Delivery is available throughout the territory of European Union and Eurasian Union countries and other countries. Shipment is available in different ways: by railroad, by heavy trucks, by sea.